FOI release

Solar photovoltaics (PV)

Case reference FOI2025/01344

Received 18 December 2025

Published 23 January 2026

Request

I am researching solar photovoltaic (PV) development and wish to make the following request under the Freedom of Information Act.

Q1 On land and building assets that are owned or controlled

* by the authority, how much solar PV capacity in kilowatt peak (kWp) has been installed? (*"controlled" means where the authority has management control of a site's facilities and utilities, such as under a long-term lease)

I would like the response for this to be separated into four categories:

* Solar PV capacity owned by the authority:

* Solar PV capacity owned by a community group:

* Solar PV capacity owned by another party, that is not a community group, where a power purchase agreement (PPA) exists to supply the authority:

* Any other solar PV capacity owned by another party:

* If an exact figure for installed solar PV in kWp cannot be obtained, please make an estimate of a minimum value that is known with confidence.

For example, “estimated – at least 100kWp”.

Q2 This question asks for information about procurement of solar PV goods and services in the past three years, where a contract has been awarded between 1 January 2023 and the date of this request.

Could you supply me with the following information please: I have also put Q2 into an Excel template (attached to this email).

Please use this to return to me, if possible. Please complete these columns for each procurement activity (add more if necessary) No.

Question Response type List 1 2 1 Procurement route Select from list Framework;

Dynamic Purchasing System;

Open Tender; Restricted Procedure;

Direct Award;

Other (Please specify) 1a If "other", please specify:

Text entry 2 What was procured Select from list Design, supply and installation of solar PV panels and related equipment (Design and Build);

Supply of solar PV panels and related equipment only;

Supply and installation of solar PV panels and related equipment (separate to design work);

Installation costs only (separate to supply of equipment or design);

Design or advisory services only;

Operations and maintenance only; Other (please specify) 2a If "other", please specify:

Text entry 3 Procurement award date

Text entry 4 Final value of the contract (GBP). (Final amount claimed by the supplier. Where a contract is still being delivered, please supply the estimated total spend by the contract end)

Text entry 5 Contract awarded to (Supplier name)

Text entry 6 Companies house company number of supplier

Text entry 7 Kilowatt peak (kWp) of solar PV installed

Text entry 8 Type of solar PV development Select from list Roof-mounted; Ground-mounted; Solar car park canopy; Other (please specify)

8a If "other", please specify:

Text entry 9 Commissioning / handover date

Text entry 10 Project location (Site name and address)

Text entry 11 Project location (Post code)

Text entry 12 What category best describes the type of site? Select from list Residential dwellings; Commercial, business and services (including offices); Industrial or storage; Schools; Other public services, leisure and community; Agricultural; Car park; Land; Other (please specify)

12a If "other", please specify:

Text entry 13 Was the project this contract relates to funded wholly or in part by an external grant? Select from list Yes - Wholly funded with grant; Yes - Partially funded with grant; No

13a If "yes", please give the value of grant funding (GBP)

Text entry 13b If "yes", please give the grant funding source

Text entry 14 Was the project this contract relates to funded or financed from any other sources external to the local authority, other than a grant? (for example, loans, bonds, other equity investors) Select from list Yes; No

14a If yes, please give the value of external funding or finance (GBP) Text entry

14b If yes, please give the source of external funding or finance Text entry

15 Please give a description of the contract.

Please include any details included in the contract value that are not solar PV or related equipment (for example, battery energy storage or additional works to a roof).

Response

Q1. On land and building assets that are owned or controlled* by the authority, how much solar PV capacity in kilowatt peak (kWp) has been installed? (*"controlled" means where the authority has management control of a site's facilities and utilities, such as under a long-term lease)

I would like the response for this to be separated into four categories: Solar PV capacity owned by the authority: Estimated 270 kWp

Solar PV capacity owned by a community group: 0.0 kWp

Solar PV capacity owned by another party, that is not a community group, where a power purchase agreement (PPA) exists to supply the authority: 0.0 kWp

Any other solar PV capacity owned by another party: 0.0 kWp

Q2. Please see Excel spreadsheet attached.

Documents

This is Tunbridge Wells Borough Council's response to a freedom of information (FOI) or environmental information regulations (EIR) request.